Concrete Slab Calculator
Updated November 17, 2026
4 inches suits patios, walkways and shed bases. We add 10% extra automatically — ground is never perfectly level, and running short mid-pour is the worst outcome.
How to use this calculator
- Measure the slab: length, width, and thickness (4 inches is standard for paths and patios).
- Type the numbers in and choose bag size — 80 lb is the common one.
- Read the answer: concrete volume with 10% already added for waste, plus the bag count and cost.
- Print the list. For big pours, compare the ready-mix yards figure before buying dozens of bags.
How the maths works: The maths: length × width × thickness = volume, plus 10% for waste. Bags divide the volume by one bag's yield (an 80 lb bag makes about 0.60 cubic feet). The full guide to the concrete calculator works a 10x12 patio in bags and yards, and shows why a 2x4 form really makes a 3.5-inch slab.
What are you using this for?
Tell us what you are making, and we will help you do it yourself. Type your project below — for example “a patio base” or “my tomato bed” — and we will show you the full method, step by step, using the estimate you just made.
A worked example, step by step
Say you are pouring a patio slab 10 ft by 10 ft, 4 inches thick — the standard thickness for patios, walkways and shed bases. Here is every step the calculator does, including the extra it adds on purpose.
- Find the area. 10 ft × 10 ft = 100 square feet.
- Turn the thickness into feet. 4 inches ÷ 12 = 0.333 ft.
- Find the raw volume. 100 × 0.333 = 33.3 cubic feet.
- Add the 10% extra. Ground is never perfectly level and some concrete stays in the wheelbarrow: 33.3 × 1.10 = 36.7 cubic feet. The calculator adds this automatically — running short mid-pour leaves a cold joint and a weak slab.
- As a ready-mix order: 36.7 ÷ 27 = 1.36 cubic yards. Trucks round to the nearest quarter or half yard, so expect to order 1.5 yards, and ask about short-load fees below the plant's minimum.
- As 80 lb bags: one bag makes about 0.6 cubic feet, so 36.7 ÷ 0.6 = 61.1, meaning 62 bags. As 60 lb bags (about 0.45 cubic feet each): 36.7 ÷ 0.45 = 81.5, meaning 82 bags.
- Feel the weight before you choose bags. 62 bags at 80 lb is about 4,960 lb of material to lift, mix and place — nearly two and a half tons. For this slab, most people order the truck.
Type the numbers, see the answer, print your list — then decide bags or truck with the real totals in front of you.
Common mistakes with concrete
Adding extra water to make mixing easier. A sloppy, soupy mix is easier to place and much weaker when cured — excess water is the single most common cause of cracked, dusty slabs. Use the water amount on the bag, and if the mix feels stiff, that is what correct concrete feels like.
Pouring on unprepared ground. Four inches of concrete over soft, uncompacted soil will settle and crack along the soft spots. Excavate, compact a gravel base, and set forms level before any concrete arrives; the slab can only be as flat and solid as what sits under it.
Forgetting the clock on ready-mix. A truck gives you a limited working window — commonly around 90 minutes from batching — and the driver cannot wait while forms get finished. Have forms, reinforcement, tools and helpers ready before the truck is booked, and never order for a day when rain is likely within the first hours of the pour.
Counting only the concrete. Forms, gravel base, reinforcement mesh or rebar, a screed board and finishing tools are part of the real shopping list. Print the calculator's list, then add the preparation items to it before you price the job.
Keep going
Soil for the garden beside that patio? The Raised Bed Soil Calculator. Finishing the beds with mulch? The Mulch Calculator. Pouring late in the year? Pouring Concrete in Cold Weather gives the temperature rules before the truck is booked.
Questions people ask
How many 80 lb bags make a cubic yard?
About 45 bags — one bag makes roughly 0.6 cubic feet.
How thick should a slab be?
4 inches for patios and walkways; 5-6 inches for driveways — check your local code.
Are the costs exact?
No — typical store-price ranges for your country. This is an estimate — prices can go up or down.
Bags or ready-mix truck — which should I choose?
As a rule of thumb, past about 1 cubic yard a ready-mix truck is usually cheaper and far less work than mixing bags. Below that, bags win on simplicity.
How long do I have to place and finish concrete?
About 90 minutes from mixing on a mild day, less in heat. Have every tool and helper ready before the first bag or the truck arrives.